Creanga Pass

1,102m 15 Toplița → Borsec 20km Asphalt
RESTRICTED DN15, km 57+320 – km 57+420, Sânpaul (MS): single lane, alternating with traffic lights, 03.08.2026 14:29 – 30.11.2026 23:59 1 CNAIR alert
RESTRICTED DN15 Km: 57+320 → 57+420
DN15, km 57+320 – km 57+420, Sânpaul (MS): single lane, alternating with traffic lights, 03.08.2026 14:29 – 30.11.2026 23:59
SANPAUL (MS) → SANPAUL (MS)
Cause: A new bridge is being built on DN15 at km 57+339.
Measures: Traffic runs on a single lane on the detour, with alternating directions controlled by temporary traffic lights.
Valid: 8/3/2026 → 11/30/2026
Show CNAIR original
Cause: Lucrari de constructie Pod nou pe DN15 km 57+339
Measures: Circulatia se desfasoara pe o singura banda, dirijata alternativ prin intermediul semafoarelor temporare pe varianta de ocolire.

Generated automatically from CNAIR's Romanian original.

Source: CNAIR (dispecerat.andnet.ro)

Updated on October 28, 2026 at 12:44

Source: CNAIR

Creanga Pass (DN15), at an altitude of 1102 meters, crosses the Giurgeu Mountains of the Eastern Carpathians, connecting the towns of Toplița and Borsec. The road links the Mureș valley to the west with the Bistricioara valley to the east, offering a picturesque crossing through coniferous forests and alpine meadows. Near the pass summit, there is a tourist stop with a restaurant and wooden cabins. The road is paved and well-maintained, open year-round.